Prefabricated MEP: How Detailed Offsite Drawings Are Changing the Economics of Construction

Walk through any live MEP installation on a UK commercial or healthcare project and the inefficiencies are visible. Multiple trades working in the same ceiling void simultaneously, cutting and threading pipe onsite, adjusting ductwork runs around late structural changes, and resolving clashes that were never properly coordinated at drawing stage. The result is predictable: labour […]